Most automation projects fail before they start: somebody picks a tool, then goes looking for a process to point it at. We do it the other way round — and the first 45 minutes decide almost everything.
01 — The one question
We open every survey with the same question: “What would you stop doing tomorrow if you could?” The answer is rarely what the brief said, and it is almost always more valuable.
“If a process can’t be drawn on one sheet, it isn’t ready to be automated.”
02 — Bill of manual work
Next we list every recurring task: who does it, how often, how long it takes and what a mistake costs. It looks like an invoice on purpose — because that’s what it is.
Name the owner of every step
Time one real run, not the estimate
Price a single mistake
Mark every decision a human makes

FIG. N.24b — The worth-it number, calculated live
03 — The worth-it number
Hours per week × loaded hourly cost × 48 weeks, minus the build. If payback is longer than a quarter, we say so — and usually suggest something smaller.
04 — What you leave with
A one-page process map, a costed plan and a straight answer on whether to automate at all. You keep all three, whether you build with us or not.